Название Размер Типы документов
Analysis and Forecasting of Traffic on the Kungrad - Beyneu Line, October 2005 11.4 MB Technical document
  • Имя файла: 40_39_WP1_ENG_71.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Draft Report Module A - Annexes 3.1 - 10.3.2 17.6 MB Project report
  • Имя файла: 40_39_AN7_ENG_121.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Feasibility Study of measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - DRAFT, September 2005 10.6 MB Project report
  • Имя файла: 40_39_IntR4_ENG_69.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Final Report Module A - Annexes, November 2004 29 MB Project report
  • Имя файла: 40_39_IntR3_ENG_211.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Inception Report (revision July 2004) 14.3 MB Project report
  • Имя файла: 40_39_IR2_ENG_75.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Inception Report, April 2004 5.9 MB Project report
  • Имя файла: 40_39_IR1_ENG_32.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Line BALIKCHI-Kazakh border - ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS 8.4 MB Technical document
  • Имя файла: 40_39_AN4_ENG_RUS_38.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Line KUNGRAD-Kazakh border - ANNEX 5 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS 11.3 MB Technical document
  • Имя файла: 40_39_AN6_ENG_RUS_45.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Line LUGOVAYA-Kyrgyz border, ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS 6.8 MB Technical document
  • Имя файла: 40_39_AN3_ENG_RUS_32.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Line Uzbek border-BEYNEU/ Узбекскаяская граница-БЕЙНЕУ - ANNEX 4 OPTIONS SCHEMES / ПРИЛОЖЕНИЕ 4 - ПОЭТАПНЫЕ СХЕМЫ ANNEX T TYPICAL DRAWINGS ПРИЛОЖЕНИЕ T - ТИПОВЫЕ СХЕМЫ 8.0 MB Technical document
  • Имя файла: 40_39AN5_ENG_RUS_36.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan) - DRAFT, July 2005 14.7 MB Project report
  • Имя файла: 40_39_Intr19_ENG_93.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan) - DRAFT, July 2005 4.9 MB Project report
  • Имя файла: 40_39_IntR17_ENG_32.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - DRAFT 17.5 MB Project report
  • Имя файла: 40_39_IntR11_ENG_112.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - DRAFT, July 2005 8.8 MB Project report
  • Имя файла: 40_39_IntR21_ENG_53.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan), October 2005 9.0 MB Project report
  • Имя файла: 40_39_IntR22_ENG_54.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of"tbe~4^habilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) 17.6 MB Project report
  • Имя файла: 40_39_IntR12_ENG_112.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), October 2005 5.0 MB Project report
  • Имя файла: 40_39_IntR18_ENG_33.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan), October 2005 14.6 MB Project report
  • Имя файла: 40_39_IntR20_ENG_92.pdf
  • Язык: English
  • Автор:
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan) - Annexes, March 2005 3.4 MB Project report
  • Имя файла: 40_39_IntR7_ENG_36.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan), March 2005 37 MB Project report
  • Имя файла: 40_39_IntR6_ENG_212.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), Annexes 2.6 MB Project report
  • Имя файла: 40_39_IntR10_ENG_27.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), March 2005 29 MB Project report
  • Имя файла: 40_39_IntR_ENG_169.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - Annexes 10.3 MB Project report
  • Имя файла: 40_39_IntR13_ENG_93.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan), March 2005 39 MB Project report
  • Имя файла: 40_39_IntR16_ENG_229.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan)- Annexes 2.5 MB Project report
  • Имя файла: 40_39_IntR15_RUS_27.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan), March 2005 25 MB Project report
  • Имя файла: 40_39_IntR8_ENG_148.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.4 - Civil Works 18.5 MB Technical document
  • Имя файла: 40_39_WP8_ENG_159.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the rehabilitation measures for the Beyneu - Uzbek border railway section (Kazakhstan) - Lot 2.1 -Telecommunications 25 MB Technical document
  • Имя файла: 40_39_WP10_ENG_183.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.1 - Civil Works and Permanent Way 36 MB Technical document
  • Имя файла: 40_39_WP11_ENG_282.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.2 - Power Supply 19.9 MB Technical document
  • Имя файла: 40_39_WP12_ENG_157.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents of the rehabilitation measures for the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Permanent Way and Civil Works - Section 9 - Drawings 46 MB Technical document
  • Имя файла: 40_39_AN1_ENG_RUS_155.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Permanent Way and Civil Works - Section 9 - Drawings 8.0 MB Technical document
  • Имя файла: 40_39_AN2_ENG_RUS_35.pdf
  • Язык: English, Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - Purchase of machines 18.7 MB Project report
  • Имя файла: 40_39_WP1_ENG_154.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documents on the rehabilitation measures for theBalykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.1 - Purchase of machines 18.9 MB Technical document
  • Имя файла: 40_39_WP5_ENG_160.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Civil Works and Permanent Way 36 MB Technical document
  • Имя файла: 40_39_WP2_ENG_276.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.2 - Power Supply 20 MB Technical document
  • Имя файла: 40_39_WP3_ENG_156.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.3 - Telecommunications 27 MB Technical document
  • Имя файла: 40_39_WP4_ENG_207.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentsfor the rehabilitation measures of the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Civil Works and Permanent Way 40 MB Technical document
  • Имя файла: 40_39_WP9_ENG_285.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.2 - Purchase of Permanent Way materials 33 MB Technical document
  • Имя файла: 40_39_WP6_ENG_250.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.3 - Purchase of sleeper factory 16.3 MB Technical document
  • Имя файла: 40_39_WP7_ENG_145.pdf
  • Язык: English
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Анализ и Прогноз Перевозок на участке Кунград - Бейнеу, Октябрь 2005 г. 12.6 MB Technical document
  • Имя файла: 40_39_WP1_RUS_76.pdf
  • Язык: Russian
  • Автор:
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Заключительный Отчет по Модулю А 41 MB Project report
  • Имя файла: 40_39_IntR2_RUS_210.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Заключительный Отчет по Модулю А - Приложения, Ноябрь 2004 31 MB Project report
  • Имя файла: 40_39_IntR3_RUS_217.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Заключительный ОтчетV предварительная версия, Сентябрь 2005 г. 8.3 MB Project report
  • Имя файла: 40_39_IntR5_RUS_47.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - TƏO по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Приложения 10.3 MB Project report
  • Имя файла: 40_39_IntR13_RUS_91.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыр 15.8 MB Project report
  • Имя файла: 40_39_IntR20_RUS_96.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) - 5.5 MB Project report
  • Имя файла: 40_39_IntR17_RUS_34.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), 5.6 MB Project report
  • Имя файла: 40_39_IntR18_RUS_34.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) 19.2 MB Project report
  • Имя файла: 40_39_IntR11_RUS_115.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) 19.4 MB Project report
  • Имя файла: 40_39_IntR12_RUS_115.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) 10.1 MB Project report
  • Имя файла: 40_39_IntR21_RUS_60.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) 10.2 MB Project report
  • Имя файла: 40_39_IntR22_RUS_61.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кырг 16.3 MB Project report
  • Имя файла: 40_39_IntR19_RUS_98.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан) - Приложения 41 MB Project report
  • Имя файла: 40_39_IntR14_RUS_228.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан), Март 2005 г. 3.8 MB Project report
  • Имя файла: 40_39_IntR7_RUS_36.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Март 2005 г. 32 MB Project report
  • Имя файла: 40_39_IntR9_RUS_183.pdf
  • Язык: Russian
  • Автор:
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Приложения 2.9 MB Project report
  • Имя файла: 40_39_IntR10_RUS_27.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Кунград- граница с Казахстаном (Узбекистан), Март 2005 г. 44 MB Project report
  • Имя файла: 40_39_IntR16_RUS_246.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Приложения 2.8 MB Project report
  • Имя файла: 40_39_IntR15_RUS_26.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан), Март 2005 г. 31 MB
  • Имя файла: 40_39_IntR8_RUS_186.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Начальный Отчет (пересмотренный в Июле 2004) 7.5 MB Project report
  • Имя файла: 40_39_IR2_RUS_39.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Начальный Отчет, Апрель 2004 6.8 MB Project report
  • Имя файла: 40_39_IR_RUS_36.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Предварительный Отчет по Модулю А, Сентябрь 2004 35 MB Project report
  • Имя файла: 40_39_IntR1_RUS_185.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Предварительный Отчет по Модулю А - Приложения 3.1 - 10.3.2 18.2 MB Project report
  • Имя файла: 40_39_AN7_RUS_121.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Текущий Отчет 1, Сентябрь 2004 7.9 MB Project report
  • Имя файла: 40_39_PrR1_RUS_50.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документация для работ по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - Закупка оборудовани 21 MB Technical document
  • Имя файла: 40_39_WP1_RUS_163.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.3 - Приобретени 19.7 MB Technical document
  • Имя файла: 40_39_WP7_RUS_159.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.4 - Общестроите 22 MB Technical document
  • Имя файла: 40_39_WP8_RUS_173.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) - Лот 2.1 -Телекоммуникации 28 MB Technical document
  • Имя файла: 40_39_WP10_RUS_189.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.1 - Приобретение 22 MB Technical document
  • Имя файла: 40_39_WP5_RUS_170.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.2 - Приобретение 37 MB Technical document
  • Имя файла: 40_39_WP6_RUS_250.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.1 - Общестроительные раб 43 MB Technical document
  • Имя файла: 40_39_WP2_RUS_287.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.2 - Энергоснабжение 26 MB Technical document
  • Имя файла: 40_39_Wp3_RUS_173.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.3 -Телекоммуникации 30 MB Technical document
  • Имя файла: 40_39_WP4_RUS_214.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
Тендерная документацияпо восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Лот 4.1 - Гражданское строител 42 MB Technical document
  • Имя файла: 40_39_WP9_RUS_298.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan
ТЭО по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - предварительный отчет, Сентябрь 2005 г. 12.2 MB Project report
  • Имя файла: 40_39_IntR4_RUS_74.pdf
  • Язык: Russian
  • Автор: TRACECA Technical Assistance Projects
  • Проект: Review of Railway rehabilitation in Central Asia
  • Вид: Rail
  • Страны: Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Uzbekistan

Детальный проект и тендерная документация - Модуль Б (Октябрь 2005)

Технико-экономическое обоснование - Модуль Б (Март 2015)

Технико-экономическое обоснование - Таджикистан (Сентябрь 2005)

Отчеты