Analysis and Forecasting of Traffic on the Kungrad - Beyneu Line, October 2005 | 11.4 MB | Technical document | |
|
|||
Draft Report Module A - Annexes 3.1 - 10.3.2 | 17.6 MB | Project report | |
|
|||
Feasibility Study of measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - DRAFT, September 2005 | 10.6 MB | Project report | |
|
|||
Final Report Module A - Annexes, November 2004 | 29 MB | Project report | |
|
|||
Inception Report (revision July 2004) | 14.3 MB | Project report | |
|
|||
Inception Report, April 2004 | 5.9 MB | Project report | |
|
|||
Line BALIKCHI-Kazakh border - ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS | 8.4 MB | Technical document | |
|
|||
Line KUNGRAD-Kazakh border - ANNEX 5 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS | 11.3 MB | Technical document | |
|
|||
Line LUGOVAYA-Kyrgyz border, ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS | 6.8 MB | Technical document | |
|
|||
Line Uzbek border-BEYNEU/ Узбекскаяская граница-БЕЙНЕУ - ANNEX 4 OPTIONS SCHEMES / ПРИЛОЖЕНИЕ 4 - ПОЭТАПНЫЕ СХЕМЫ ANNEX T TYPICAL DRAWINGS ПРИЛОЖЕНИЕ T - ТИПОВЫЕ СХЕМЫ | 8.0 MB | Technical document | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan) - DRAFT, July 2005 | 14.7 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan) - DRAFT, July 2005 | 4.9 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - DRAFT | 17.5 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - DRAFT, July 2005 | 8.8 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan), October 2005 | 9.0 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of"tbe~4^habilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) | 17.6 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), October 2005 | 5.0 MB | Project report | |
|
|||
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan), October 2005 | 14.6 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan) - Annexes, March 2005 | 3.4 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan), March 2005 | 37 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), Annexes | 2.6 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), March 2005 | 29 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - Annexes | 10.3 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan), March 2005 | 39 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan)- Annexes | 2.5 MB | Project report | |
|
|||
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan), March 2005 | 25 MB | Project report | |
|
|||
Tender Documents on the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.4 - Civil Works | 18.5 MB | Technical document | |
|
|||
Tender Documents on the rehabilitation measures for the Beyneu - Uzbek border railway section (Kazakhstan) - Lot 2.1 -Telecommunications | 25 MB | Technical document | |
|
|||
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.1 - Civil Works and Permanent Way | 36 MB | Technical document | |
|
|||
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.2 - Power Supply | 19.9 MB | Technical document | |
|
|||
Tender Documents of the rehabilitation measures for the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Permanent Way and Civil Works - Section 9 - Drawings | 46 MB | Technical document | |
|
|||
Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Permanent Way and Civil Works - Section 9 - Drawings | 8.0 MB | Technical document | |
|
|||
Tender Documents on the measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - Purchase of machines | 18.7 MB | Project report | |
|
|||
Tender Documents on the rehabilitation measures for theBalykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.1 - Purchase of machines | 18.9 MB | Technical document | |
|
|||
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Civil Works and Permanent Way | 36 MB | Technical document | |
|
|||
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.2 - Power Supply | 20 MB | Technical document | |
|
|||
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.3 - Telecommunications | 27 MB | Technical document | |
|
|||
Tender Documentsfor the rehabilitation measures of the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Civil Works and Permanent Way | 40 MB | Technical document | |
|
|||
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.2 - Purchase of Permanent Way materials | 33 MB | Technical document | |
|
|||
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.3 - Purchase of sleeper factory | 16.3 MB | Technical document | |
|
|||
Анализ и Прогноз Перевозок на участке Кунград - Бейнеу, Октябрь 2005 г. | 12.6 MB | Technical document | |
|
|||
Заключительный Отчет по Модулю А | 41 MB | Project report | |
|
|||
Заключительный Отчет по Модулю А - Приложения, Ноябрь 2004 | 31 MB | Project report | |
|
|||
Заключительный ОтчетV предварительная версия, Сентябрь 2005 г. | 8.3 MB | Project report | |
|
|||
Модуль Б - TƏO по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Приложения | 10.3 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыр | 15.8 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) - | 5.5 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), | 5.6 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) | 19.2 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) | 19.4 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) | 10.1 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) | 10.2 MB | Project report | |
|
|||
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кырг | 16.3 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан) - Приложения | 41 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан), Март 2005 г. | 3.8 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Март 2005 г. | 32 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Приложения | 2.9 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Кунград- граница с Казахстаном (Узбекистан), Март 2005 г. | 44 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Приложения | 2.8 MB | Project report | |
|
|||
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан), Март 2005 г. | 31 MB | ||
|
|||
Начальный Отчет (пересмотренный в Июле 2004) | 7.5 MB | Project report | |
|
|||
Начальный Отчет, Апрель 2004 | 6.8 MB | Project report | |
|
|||
Предварительный Отчет по Модулю А, Сентябрь 2004 | 35 MB | Project report | |
|
|||
Предварительный Отчет по Модулю А - Приложения 3.1 - 10.3.2 | 18.2 MB | Project report | |
|
|||
Текущий Отчет 1, Сентябрь 2004 | 7.9 MB | Project report | |
|
|||
Тендерная документация для работ по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - Закупка оборудовани | 21 MB | Technical document | |
|
|||
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.3 - Приобретени | 19.7 MB | Technical document | |
|
|||
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.4 - Общестроите | 22 MB | Technical document | |
|
|||
Тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) - Лот 2.1 -Телекоммуникации | 28 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.1 - Приобретение | 22 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.2 - Приобретение | 37 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.1 - Общестроительные раб | 43 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.2 - Энергоснабжение | 26 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.3 -Телекоммуникации | 30 MB | Technical document | |
|
|||
Тендерная документацияпо восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Лот 4.1 - Гражданское строител | 42 MB | Technical document | |
|
|||
ТЭО по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - предварительный отчет, Сентябрь 2005 г. | 12.2 MB | Project report | |
|
DRAFT Detailed Design and Tender Documents - Module B (July 2005)
General Report Balykchi-Kazakh Border en (7.06 mb)
General Report Beyneu-Uzbek Border en (3.61 mb)
General Report Lugovaya-Kyrgyz Border en (4.09 mb)
Detailed Design and Tender Documents - Module B (October 2005)
Feasibility Studies - Module B (March 2005)
Balikchi-Kazakh Border en (10.3 mb)
Beyneu-Uzbek Border en (8.1 mb)
Kungrad-Kazakh border en (14.35 mb)
Lugovaya-Kyrryz Border en (5.03 mb)
Feasibility Study - Tajikistan (September 2005)
Feasibility Study Tajikistan - Draft eng (8.35 mb)
Reports
Draft Final report eng (939 kb) September 2005
Draft Report Module A eng (12.38 mb) September 2004
Final Report Module A (15.01 mb) November 2004