Title
|
Size
|
Document types
|
|
Analysis and Forecasting of Traffic on the Kungrad - Beyneu Line, October 2005
|
11.4 MB
|
Technical document
|
|
|
Draft Report Module A - Annexes 3.1 - 10.3.2
|
17.6 MB
|
Project report
|
|
|
Feasibility Study of measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - DRAFT, September 2005
|
10.6 MB
|
Project report
|
|
|
Final Report Module A - Annexes, November 2004
|
29 MB
|
Project report
|
|
|
Inception Report (revision July 2004)
|
14.3 MB
|
Project report
|
|
|
Inception Report, April 2004
|
5.9 MB
|
Project report
|
|
|
Line BALIKCHI-Kazakh border - ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS
|
8.4 MB
|
Technical document
|
|
|
Line KUNGRAD-Kazakh border - ANNEX 5 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS
|
11.3 MB
|
Technical document
|
|
|
Line LUGOVAYA-Kyrgyz border, ANNEX 3 OPTIONS SCHEMES, ANNEX T TYPICAL DRAWINGS
|
6.8 MB
|
Technical document
|
|
|
Line Uzbek border-BEYNEU/ Узбекскаяская граница-БЕЙНЕУ - ANNEX 4 OPTIONS SCHEMES / ПРИЛОЖЕНИЕ 4 - ПОЭТАПНЫЕ СХЕМЫ ANNEX T TYPICAL DRAWINGS ПРИЛОЖЕНИЕ T - ТИПОВЫЕ СХЕМЫ
|
8.0 MB
|
Technical document
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan) - DRAFT, July 2005
|
14.7 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan) - DRAFT, July 2005
|
4.9 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - DRAFT
|
17.5 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - DRAFT, July 2005
|
8.8 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan), October 2005
|
9.0 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of"tbe~4^habilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan)
|
17.6 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), October 2005
|
5.0 MB
|
Project report
|
|
|
Module В - Detailed Design and Tender Documents of the rehabilitation measures for the Balykchi - Bishkek - Kazakh Border railway section (Kyrgyzstan), October 2005
|
14.6 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan) - Annexes, March 2005
|
3.4 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Balykchi - Kazakh Border railway section (Kyrgyzstan), March 2005
|
37 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), Annexes
|
2.6 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Beyneu - Uzbek Border railway section (Kazakhstan), March 2005
|
29 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan) - Annexes
|
10.3 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Kungrad - Kazakh Border railway section (Uzbekistan), March 2005
|
39 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan)- Annexes
|
2.5 MB
|
Project report
|
|
|
Module В - Feasibility Study of the rehabilitation measures for the Lugovaya - Kyrgyz Border railway section (Kazakhstan), March 2005
|
25 MB
|
Project report
|
|
|
Tender Documents on the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.4 - Civil Works
|
18.5 MB
|
Technical document
|
|
|
Tender Documents on the rehabilitation measures for the Beyneu - Uzbek border railway section (Kazakhstan) - Lot 2.1 -Telecommunications
|
25 MB
|
Technical document
|
|
|
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.1 - Civil Works and Permanent Way
|
36 MB
|
Technical document
|
|
|
Tender Documents on the rehabilitation measures for the Kungrad - Kazakh border railway section (Kazakhstan) - Lot 1.2 - Power Supply
|
19.9 MB
|
Technical document
|
|
|
Tender Documents of the rehabilitation measures for the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Permanent Way and Civil Works - Section 9 - Drawings
|
46 MB
|
Technical document
|
|
|
Tender Documents of the rehabilitation measures for the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Permanent Way and Civil Works - Section 9 - Drawings
|
8.0 MB
|
Technical document
|
|
|
Tender Documents on the measures for the rehabilitation and renewal of the freight wagon fleet of Tajik Railways - Purchase of machines
|
18.7 MB
|
Project report
|
|
|
Tender Documents on the rehabilitation measures for theBalykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.1 - Purchase of machines
|
18.9 MB
|
Technical document
|
|
|
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.1 - Civil Works and Permanent Way
|
36 MB
|
Technical document
|
|
|
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.2 - Power Supply
|
20 MB
|
Technical document
|
|
|
Tender Documentsfor the rehabilitation measures of the Kungrad - Kazakh border railway section (Uzbekistan) - Lot 1.3 - Telecommunications
|
27 MB
|
Technical document
|
|
|
Tender Documentsfor the rehabilitation measures of the Lugovaya - Kyrgyz border railway section (Kazakhstan) - Lot 4.1 - Civil Works and Permanent Way
|
40 MB
|
Technical document
|
|
|
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.2 - Purchase of Permanent Way materials
|
33 MB
|
Technical document
|
|
|
Tender Documentson the rehabilitation measures for the Balykchi - Bishkek - Kazakh border railway section (Kyrgyzstan) - Lot 3.3 - Purchase of sleeper factory
|
16.3 MB
|
Technical document
|
|
|
Анализ и Прогноз Перевозок на участке Кунград - Бейнеу, Октябрь 2005 г.
|
12.6 MB
|
Technical document
|
|
|
Заключительный Отчет по Модулю А
|
41 MB
|
Project report
|
|
|
Заключительный Отчет по Модулю А - Приложения, Ноябрь 2004
|
31 MB
|
Project report
|
|
|
Заключительный ОтчетV предварительная версия, Сентябрь 2005 г.
|
8.3 MB
|
Project report
|
|
|
Модуль Б - TƏO по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Приложения
|
10.3 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыр
|
15.8 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) -
|
5.5 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан),
|
5.6 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан)
|
19.2 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан)
|
19.4 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан)
|
10.1 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан)
|
10.2 MB
|
Project report
|
|
|
Модуль Б - Детальный проект и тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кырг
|
16.3 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан) - Приложения
|
41 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Балыкчи - граница с Казахстаном (Кыргызстан), Март 2005 г.
|
3.8 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Март 2005 г.
|
32 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан), Приложения
|
2.9 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Кунград- граница с Казахстаном (Узбекистан), Март 2005 г.
|
44 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Приложения
|
2.8 MB
|
Project report
|
|
|
Модуль Б - ТЭО по восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан), Март 2005 г.
|
31 MB
|
|
|
|
Начальный Отчет (пересмотренный в Июле 2004)
|
7.5 MB
|
Project report
|
|
|
Начальный Отчет, Апрель 2004
|
6.8 MB
|
Project report
|
|
|
Предварительный Отчет по Модулю А, Сентябрь 2004
|
35 MB
|
Project report
|
|
|
Предварительный Отчет по Модулю А - Приложения 3.1 - 10.3.2
|
18.2 MB
|
Project report
|
|
|
Текущий Отчет 1, Сентябрь 2004
|
7.9 MB
|
Project report
|
|
|
Тендерная документация для работ по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - Закупка оборудовани
|
21 MB
|
Technical document
|
|
|
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.3 - Приобретени
|
19.7 MB
|
Technical document
|
|
|
Тендерная документация по восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.4 - Общестроите
|
22 MB
|
Technical document
|
|
|
Тендерная документация по восстановительным работам на участке Бейнеу - граница с Узбекистаном (Казахстан) - Лот 2.1 -Телекоммуникации
|
28 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.1 - Приобретение
|
22 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Балыкчи - Бишкек - граница с Казахстаном (Кыргызстан) - Лот 3.2 - Приобретение
|
37 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.1 - Общестроительные раб
|
43 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.2 - Энергоснабжение
|
26 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Кунград - граница с Казахстаном (Узбекистан) - Лот 1.3 -Телекоммуникации
|
30 MB
|
Technical document
|
|
|
Тендерная документацияпо восстановительным работам на участке Луговая - граница с Кыргызстаном (Казахстан) - Лот 4.1 - Гражданское строител
|
42 MB
|
Technical document
|
|
|
ТЭО по восстановлению и обновлению парка грузовых вагонов Таджикской Железной Дороги - предварительный отчет, Сентябрь 2005 г.
|
12.2 MB
|
Project report
|
|
|