Title | Size | Document types | |
---|---|---|---|
3rd Round Table Meeting: ESTABLISHING A CORRIDOR COORDINATING CENTRE FOR OIL TRANSPORTS BY RAIL ON THE BAKU- BATUMI/POTI CORRIDOR - Baku 2003 | 5.2 MB | Technical document | |
|
|||
Concept for the establishing and implementation of a Corridor Coordination Centre to improve oil transportation by rail along the trans-Caucasian TRACECA route | 1.8 MB | Technical document | |
|
|||
Module В: Special Report on Supsa Port Administration, July 2003 | 5.3 MB | Project report | |
|
|||
Project Completion Report, January 2004 | 17.9 MB | Project report | |
|
|||
Railway Transit Oil Logistical Center - Inception Report | 221 KB | Project report | |
|
|||
Railway Transit Oil Logistical Center - Progress Report 1 | 6.8 MB | Project report | |
|
|||
Railway Transit Oil Logistical Center - Progress Report 2 | 876 KB | Project report | |
|
|||
Railway Transit Oil Logistical Center - Project Fiche | 11.3 KB | Project fiche | |
|
|||
Railway Transit Oil Logistical Center - Terms of Reference | 63 KB | Project Terms of Reference | |
|
|||
Working Paper - 1 | 14.0 MB | Technical document | |
|
|||
Начальный отчет, Февраль 2003 | 8.3 MB | Project report | |
|
|||
Отчет о завершении проекта, Январь 2004 г. | 20 MB | Project report | |
|
|||
Промежуточный отчёт 1, Май 2003 г. | 24 MB | Project report | |
|
|||
Промежуточный отчёт 2, Сентябрь 2003 г. | 12.3 MB | Project report | |
|