Title | Size | Document types | |
---|---|---|---|
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Completion Report | 270 KB | Project report | |
|
|||
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Draft Project Completion Report | 218 KB | Project report | |
|
|||
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Inception Report | 235 KB | Project report | |
|
|||
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Progress Report | 156 KB | Project report | |
|
|||
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Project Fiche | 11.9 KB | Project fiche | |
|
|||
Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan - Terms of Reference | 62 KB | Project Terms of Reference | |
|
|||
Draft Drawings / Предварительные Чертежи | 7.0 MB | Technical document | |
|
|||
Draft Engineering Report Construction of the Gasan Su Cay and Shemkir bridges | 22 MB | Project report | |
|
|||
Draft Tender Document | 49 MB | Technical document | |
|
|||
Армения от Еревана к Грузинской границе, Дороги М3 И М6 - Черновой вариант отчета, Том 1 | 28 MB | Project report | |
|
|||
Отчет о Завершении проекта | 7.0 MB | Project report | |
|
|||
Отчет Развития Проекта | 4.7 MB | Project report | |
|
|||
Предварительный Инженерный Отчет Строительство мостов Гасансу- чай и Шамкир | 26 MB | Project report | |
|
|||
Предварительный Отчет Проекта | 6.0 MB | Project report | |
|
|||
Проект - Отчет о Завершении Проекта | 6.7 MB | Project report | |
|