Rehabilitation of the Armenian Railway Infrastructure
- Country: Armenia
- Mode: Rail
- Investment Volume: € 915 million
- Project status: Priority
Geographical Description
The whole project is part of the West –East railway corridor, 180 km (Turkish border-Georgian border-Azeri border)
Technical Description
Activity 1
• Rehabilitation of the existing rail link Yerevan-Tbilisi
Activity 2
• Complete reopening of Hrazdan – Ijevan section (constructed in 1984, partially operating, nearly 2 km of landslide zone)
Activity 3
• Construction of new rail link Vanadzor – Fioletovo
Economic Description / Assessment
Rehabilitation of section Georgian border-Yerevan
OPTION “A”
Complete renewal of 101 km of track equipment, with few changes in the layout. Rehabilitation of the infrastructures.
Total amount of costs for rehabilitation works: € 647,7 million
OPTION “B”
Complete renewal of 60 km of track equipment, with few changes in the layout. Rehabilitation of the infrastructures.
Total amount of costs for rehabilitation works: € 475 million
Hrazdan – Ijevan section
• Landslide arrangements
• Overpass in Agartev River
• Tunnel under Agartsin (Kuybyshevo) village
• New line trough Agartsin (Kuybyshevo) village
Other interventions
• 8 bridges and 10 tunnels to be rehabilitated (total cost: € 8 million)
• Track equipment and signaling system renewal
complete renewal:
€ 176,5 million
partial renewal in the section with landslide and general overhaul:
€ 121,85 million
New rail link Vanadzor – Fioletovo
Total estimated cost: € 200 million (€ 5 million per km)
Other involved Parties
Institutional Framework
Ministry of Transport and Communication of RA / "South Caucasus Railways" SJSC-SCR